New! AI-Powered SOPs — Turn a recorded walkthrough into an SOP draft. See AI SOP Features

How to measure shop output when every job is custom

A piece count works best when the pieces are comparable. In a custom cabinet shop, job points offer another way to express completed output: subtract material cost from job value, then divide by 100. The value comes from applying a consistent method, not from treating points as profit.

Kaizenify team ·

Why a cabinet count can be misleading

Ten basic boxes and ten detailed vanities are the same piece count, but they may represent very different amounts of work and selling value. A count can still help you understand a particular repeatable process. It becomes less informative when the mix changes and you compare totals as though every unit were equivalent.

Before changing the measurement, define the question. Are you checking the flow of parts through a station, completed jobs leaving the shop, or output against a daily target? Use one clearly described measure for each question.

The job-points formula

Job points = (job total − material cost) ÷ 100

This is the points approach described in Kaizenify's published guidance for custom work. The divisor converts the remaining job value into a manageable scale. It does not turn the result into labor hours, cost, cash received or net profit.

Use job total and material cost on the same currency and accounting basis. Avoid comparing a tax-inclusive total with a tax-exclusive material figure. Document the basis you choose so a change in data entry does not look like a production improvement.

Worked example: two different jobs

The following numbers are illustrative, not customer results.

JobJob totalMaterial costCalculationPoints
Cabinet package A$12,000$4,500($12,000 − $4,500) ÷ 10075
Vanity package B$3,200$1,200($3,200 − $1,200) ÷ 10020
Both jobs completed$15,200$5,700($15,200 − $5,700) ÷ 10095

The 95 points describe output on this chosen basis. They do not mean $9,500 of profit. Labor, overhead and other expenses remain outside this simple calculation.

Decide what counts as completed

Choose a clear completion boundary and write it beside the report. For example, a shop may count a package after final inspection rather than when cutting begins. That is an illustrative reporting policy, not a prescribed Kaizenify software setting.

Record the job identifier, its points and the completion date. Count it once at the chosen boundary. Do not add the same full-job points at cutting, edgebanding and assembly and then call their sum completed shop output.

A remake is not another sale. Log the rework separately so redoing a component does not artificially increase reported output.

What about work that takes several days?

A completed-job measure can look uneven when large jobs cross the finish line only occasionally. Review a rolling period alongside the daily result, and keep a separate view of work waiting between stations.

If your shop uses milestone-based credit, define the milestones and allocation in advance. Their combined credit must not exceed the job total. Do not guess a percentage complete at the end of the day just to improve the chart.

What points can and cannot tell you

Points can help you...Points do not establish...
Express different jobs on one consistent value-based scaleActual net profit
Compare completed output with a target on the same basisExact labor required for every job
Notice changes worth investigatingThe cause of a production change
Discuss output alongside defects and downtimeWhether the original estimate was accurate

Pricing changes, discounts and material prices can affect points even when the physical process has not changed. Review these influences before interpreting a rise in points as better efficiency. For repeatable tasks, timing and piece counts may provide useful additional context.

Put the number beside the explanation

A daily report becomes more useful when it records both output and the interruptions around it. Pair points with a daily production report, a defect log, and a note about waiting or missing materials.

If the shop misses its target on a day with repeated remakes, investigate the rework. If a large completed job makes one day look unusually strong, review the broader period. The purpose is to direct attention to the process, not score people from a single number.

Where Kaizenify fits

Kaizenify's dashboard focuses on daily production targets and actual output. Quality Tracking helps the team focus on recurring problems. Use these alongside the scheduling, job-costing and accounting systems that serve those separate purposes.

For the broader routine, read shop floor management for small shops. For the first conversation with your team, use the adoption guide.

Keep the completion rule consistent and connect the result with the problems the team needs to solve.

Free Trial